Wealden House Demolition Near East Grinstead for 50 New Homes

We demolished the former Wealden House Life Improvement Centre and adjoining offices in Ashurst Wood, near East Grinstead, as the first phase of a proposed residential redevelopment.

SECTOR

Residential Development

LOCATION

Ashurst Wood, East Grinstead, West Sussex

SCOPE

Former Life Improvement Centre and Adjoining Offices

THE PROJECT

Preparing a Brownfield Site for New Homes

Proposed New Homes
0

Phase 1

Demolition and Site Clearance

The site comprised the former Wealden House Life Improvement Centre and adjoining office accommodation that had become surplus to requirements. J Mould carried out a full demolition and site clearance programme to prepare the brownfield site for residential redevelopment.

The proposed scheme includes 50 new homes, a mix of apartments and houses.

PROJECT OUTCOME

Cleared for the Next Stage

The demolition and site clearance prepared the former Wealden House site for the next stage of the residential redevelopment.

Arrange a Site Visit.

HOW A DEMOLITION RUNS

Five Stages, One Team, Start to Finish

01

Survey & Planning

We survey the structure, check for asbestos and set the demolition sequence against what the survey finds.

02

Licensing & Approvals

Section 80 notice, asbestos survey and licensed removal, and the environmental permits the site needs, all in place before work starts.

03

Site Setup

Hoarding, exclusion zones and services isolated, with every operative briefed on the method statement before they go on

04

Demolition

The structure comes down to the sequence agreed at survey, by high-reach, machine or hand as the site allows.

05

Recycling & Clearance

Arisings are crushed and reused on site where the scheme allows, and everything else goes back to our own Materials Recycling Facility.

FOR THE TRADE

Demolition, Waste Management and Aggregates From One Contractor

One contractor, from first strike to final load. Demolition, waste removal, recycling, aggregates, haulage and plant, under one programme, with one point of contact and one company accountable for what happens on your site.

Demolition

Full and partial demolition, soft strip and site clearance, anywhere in the UK.

Plant Haulage

HIAB, low loader and walking floor, moving plant and bulk between sites.

Waste Management

Collected, weighed and processed at our own facility, with the paperwork on the load.

Aggregates

Washed and dry aggregates straight off our own washplant, including Type 1 and 6F5.

Grab Hire

Muck away and bulk removal, loaded and gone without holding the site up.

Fleet of J Mould tipper and crane lorries against a dark teal backdrop

Need a Price for Your Next Project?

For Homeowners

Skip Hire & Domestic Demolition in Reading and Across the RG Postcodes

Four sizes, priced before you book, off our own fleet. 4, 6, 8 and 12 yard skips from £260 plus VAT, with the price and the availability shown before you pay, and the skip arriving on a J Mould lorry rather than a booking agent's.

4, 6, 8 and 12 yard skips for house clearances, renovations and garden projects. Delivered and collected Monday to Friday.

Garages, outbuildings, conservatories and extensions, taken down and taken away.

Illustrated red J.Mould skip lorry with skip hire arm, dark background

Not Sure What Size You Need?

Client Reviews

What Our Customers Say

J Mould Google rating of 4.5 out of 5

Housebuilders, civil engineers and contractors who have used us for years.

READY TO GET STARTED?

Tell Us About the Job

From a skip on the drive or a domestic demolition, to a commercial demolition with the plant hire, haulage and waste that goes with it. One company, one number, an answer within the working day.

J Mould HIAB hire flatbed lorry with a Since 1969 badge